Management Plans

Acid Sulfate Soil Management Plans
Acid sulfate soils (ASS) are naturally occurring soils and sediments rich in iron sulfides. When exposed to air through to activities like excavation or drainage, these sulfides oxidise, producing sulfuric acid.
This acidification can cause environmental degradation, water contamination and structural damage. In turn, these damages can lead to project delays, financial punishment and may even require costly remediation works.
To mitigate these risks, implementing a comprehensive Acid Sulfate Soil Management Plan (ASSMP) is essential. An ASSMP helps you protect the integrity of your project and its surrounding environment and also acts as proof of compliance when reporting to the Department of Water and Environmental Regulation (DWER).
A detailed site investigation for ASS will be required prior to the commencement of any development site works to identify the presence or absence of ASS likely to be disturbed and define the nature and extent of ASS (including existing and potential acidity) in order to determine appropriate management options. Where ASS is present, these management options will be outlined in an ASS Management Plan (ASSMP). An ASSMP may be required if a development includes any dewatering or drainage works, and/or the excavation of more than 100 cubic metres of soil.
At West Soil & Water, we specialise in crafting tailored ASSMPs that ensure safe and sustainable development across WA.
Who Needs a Management Plan?
An ASSMP is necessary for any project that may disturb ASS, especially in areas identified as having a moderate to high risk of ASS occurrence. In Western Australia, the DWER mandates an ASSMP for developments involving:
- Dewatering or Drainage Activities: Projects proposing temporary or permanent dewatering or drainage works.
- Significant Soil Excavation: Projects involving the excavation of 100 cubic meters or more of soil (approximately 10 standard dump truck loads).
The kind of activities that might generate acid through the disturbance of soils includes the following:
- Major earthworks—large scale excavations for canal developments and estates.
- Infrastructure earthworks—digging for clearways, roads, tunnels and railways.
- Excavating for underground services or drainage channels.
It is important to note that the Western Australian Planning Commission’s guidelines emphasise the importance of addressing ASS at various planning stages to prevent adverse environmental impacts.
You can read more about whether your site will need an ASSMP in our article ‘Who Needs an ASSMP?’.
How West Soil & Water Constructs a Soil Management Plan
At WSW, we follow a carefully considered process to develop robust and effective ASSMPs:
- Comprehensive Site Assessment: We conduct detailed investigations to identify the presence and extent of ASS on your site. This includes soil sampling and analysis to determine existing and potential acidity levels, providing a foundation for effective management strategies.
- Risk Evaluation: Assessing the potential environmental impacts of disturbing ASS, we consider factors such as soil composition, hydrology and proposed construction activities. This assessment informs the development of targeted mitigation measures.
- Customised Management Strategies: Based on our assessments, we formulate practical and auditable management strategies, including:
- Prevention Measures: Designing project plans to avoid or minimise ASS disturbance, thereby reducing the risk of acidification.
- Neutralisation Techniques: Specifying the use of appropriate neutralising agents with precise application rates based on soil acidity levels.
- Water Management: Implementing controlled drainage and maintaining appropriate water tables to prevent sulfide oxidation.
- Monitoring and Reporting Protocols: We establish comprehensive monitoring programs to track soil and water quality throughout the project’s lifecycle. Regular reporting ensures that management measures are effective and allows for timely adjustments if necessary.
- Regulatory Compliance: Our ASSMPs are designed to meet all regulatory requirements set by DWER, ensuring your project or development complies with local laws and guidelines. Submitting this plan and any subsequent updates or reviews will act as suitable proof of compliance.
You can read more about our process in our article ‘How WSW Creates ASSMPs in WA’.
A description of the management strategies proposed should be included, which is not limited to:
- The strategies for preventing the oxidation of iron sulfides, primarily avoidance, where possible.
- The soil excavation and treatment strategies, including neutralisation material and calculations.
- The details of temporary storage, re-use or disposal plans for excavated ASS.
- The containment strategies for any contaminated stormwater or acidic leachate.
- The details of dewatering effluent treatment, management and disposal, and contingency measures (where required).
- The performance criteria to be used to assess the effectiveness of the ASS management and monitoring measures.
- A comprehensive monitoring program for soils, surface water and groundwater quality, designed to enable the effectiveness of the management strategy to be assessed.
- A description of the contingency procedures to be implemented.
- An outline of reporting procedures and frequencies for meeting environmental performance objectives.
- A commitment to submit a closure report, at the conclusion of site works.
West Soil and Water: Leaders in Soil Management in Western Australia
Engaging experienced environmental consultants like West Soil & Water is essential for effective ASS management. We have an expert understanding of acid sulfate soils and how they interact with WA’s unique environmental conditions.
That expertise ensures that all regulatory requirements are met and that environmental impacts are minimised, promoting sustainable development practices across the state.
For more information or to discuss how we can assist with your ASSMP, please contact WSW or fill out the form below.
Learn More About Acid Sulfate Soils
We have published a host of articles to help you make informed decisions about managing ASS occurrences on your site. You can read more about:
Acid Sulfate Soils
What are ASS? The Causes of Soil Acidity and How to Approach Them
The Cost of ASS Mismanagement: Avoiding Expensive Remediation Projects
ASS and Soil Degradation: Preventing Long-Term Environmental Damage
How to Identify Acid Sulfate Soils Before Breaking Ground
How Acid Sulfate Soils Affect Perth’s Groundwater
ASSMPs
Who Needs an ASSMP?
Monitoring and Reporting for ASS: What’s Required for Compliance?
5 Common Mistakes in ASSMPs and How to Avoid Them
How WSW Creates ASSMPs in WA
How to Implement an ASSMP
An ASSMP must provide: Evidence of practical, achievable and auditable plans for the management of the project to ensure that environmental impacts are minimised – including comprehensive monitoring and control of construction and operational impacts; A framework to confirm compliance with approval conditions stipulated by regulatory authorities; and Evidence that the project management will be conducted in an environmentally acceptable manner.
For further information, please refer to the following investigation and management guidelines: DWER 2015, Identification and investigation of acid sulfate soils and acidic landscapes, DWER, Perth. DWER 2015, Treatment and management of soils and water in acid sulfate soil landscapes, DWER, Perth.